Learn · Remodeling

Remodeling, in plain English.

Kitchens, baths, basements, permits and living through a project.

The lingo.

Allowance
A dollar amount in the contract set aside for items you have not picked yet, such as tile or fixtures. Pick above the allowance and you pay the difference.
Backsplash and countertop
Quartz is engineered stone, low maintenance; granite is natural and sealed; butcher block and laminate are the budget options. Templates are made after cabinets are set.
Change order
A written amendment to the contract for work added or removed after signing. Every change should have one, with a price, before the work is done.
Contingency
Money set aside, usually 10 to 20 percent, for what the walls hide. Older houses always hide something.
Draw schedule
When payments are due, tied to milestones. A deposit, progress payments and a final payment after a punch list is normal; a large payment up front is not.
Drywall finish level
Levels 0 to 5 describe how smooth the taping and mudding is. Level 4 is the usual paint-ready finish; Level 5 is a skim coat for glossy paint or harsh light.
Egress
A code-required way out of a room in an emergency. Finished basements and bedrooms need an egress window or door.
Lien waiver
A signed statement from the contractor or a supplier that they have been paid and give up the right to a lien on your house. Ask for them with each payment on a big project.
Load-bearing wall
A wall that carries the weight of the floor or roof above. Removing one needs a beam sized by an engineer and a permit.
Permit
The municipality's approval to build, with inspections along the way. Structural, electrical, plumbing and most additions need one; the homeowner is on the hook for unpermitted work when the house sells.
Punch list
The list of small items to finish or fix at the end of a project, walked with the contractor before final payment.
Rough-in
The plumbing, electrical and HVAC installed inside open walls before drywall. Inspected before it is covered.
Scope of work
The written list of exactly what is included. Vague scopes are where disputes come from; read it before the price.
Soft-close
Cabinet hinges and drawer slides that catch and close gently. Standard on mid-range cabinets now.
Subcontractor
A specialist hired by your general contractor: electrician, plumber, tile setter. The general is responsible for them and for pulling them together.

Guides.

Reading list.

Articles from around the internet that our Pros trust. They open on the source's site.

  • Hiring a contractor · Federal Trade Commission

    How to find and vet a contractor, what belongs in the contract and what to do if things go wrong.

  • Lead-safe renovation · U.S. EPA

    Rules for remodeling homes built before 1978.

From the Pros.

Written by the people who do this work every day, in your area.

The first posts from Remodeling Pros are on their way.

Questions from homeowners.

Ask the Pros

No questions yet for Remodeling. Yours would be the first, and a Pro will answer it.